Portable Meter Test System For Three Phase Energy Meters With Automatic Calibration

Brief: Thinking about an upgrade? This short demo helps you evaluate the fit. Watch as we demonstrate the Portable Meter Test System for Three Phase Energy Meters in action. You'll see how it performs fully automatic or manual calibration, verifies meters against international standards, and generates detailed reports. Learn how its high-capacity current output and harmonic generation capabilities can streamline your testing workflow.
Related Product Features:
  • Performs fully automatic or manual control calibration for three-phase energy meters with an integrated reference standard and current/voltage source.
  • Calibrates basic error, creeping, starting, and standard deviation automatically or via single-step manual control.
  • Verifies and calibrates up to 3 units of single-phase or three-phase meters compliant with MS IEC and BS standards.
  • Current source outputs up to 3x120A continuously for a minimum of 3 hours.
  • Generates 2nd to 63rd harmonics and can function as a harmonic source for comprehensive testing.
  • Features automatic operation with predefined load points controllable via keyboard, mouse, or external laptop.
  • Displays voltage, current, phase angle, vector diagrams, waveforms, and harmonics for detailed analysis.
  • Includes 32GB internal memory for data storage and supports result upload via Ethernet for easy reporting.
Ερωτήσεις:
  • What international standards does this test system comply with?
    The system verifies and calibrates meters complying with MS IEC 62052-11, MS IEC 62053-21, MS IEC 62053-22, MS IEC 62053-23, MS IEC 62053-31, MS IEC 62063-61, and BS568.
  • How many meters can be tested simultaneously?
    It can verify and calibrate up to 3 units of single-phase meters or three-phase meters at the same time, with an optional capability for testing 3 units of three-phase close-link meters.
  • What is the maximum current output and duration?
    The current source can output up to 3x120A continuously for a minimum of 3 hours, ensuring reliable performance during extended testing sessions.
  • Can the system operate automatically?
    Yes, it supports fully automatic operation with predefined load points, which can be controlled using the equipment's keyboard and mouse or via an external laptop.
Σχετικά βίντεο

σύστημα δοκιμής μετρητών

Άλλα Βίντεο
September 01, 2024

Advanced Energy Meter Test Bench for Utility and Laboratory Use

Εγκαταστάσεις δοκιμής μετρητών
December 12, 2025